Skip to content

Process expertise. Chinese manufacturing. Global perspective.

PREASYS

Explore our solutions

Sterile Preparations Equipment & Injectable Filling Lines

Sterile preparation equipment connects product preparation, container handling, filling and closing with the required inspection and transfer interfaces. Bulk containers, ready-to-use presentations and blow-fill-seal follow different routes; the directory helps identify the operation and the boundary that your process needs.

Enclosed vial filling line with a guarded transfer path

Your process, your benefits

The container arriving at the filler may be washed bulk glass, an item protected in a ready-to-use nest, or a polymer container formed within a BFS process. Product state also changes the route: liquid dosing, direct powder filling and liquid filling followed by freeze drying are separate choices. Barrier and component-preparation systems support the chosen route rather than forming one compulsory sequence.

Select a sterile process boundary

Choose the operation you need to specify. The equipment directory below also covers component preparation, utilities and finishing.

4

Container infeed options

View pages : Container infeed options

6

Filling platforms to compare

View pages : Filling platforms to compare

3

Barrier and integrity directories

View pages : Barrier and integrity directories

Preparation system

Liquid preparation combines the specified ingredients and transfers the bulk product toward filling. Mixing, hold conditions, filtration where appropriate and the product-contact path must suit the formulation.

Washing&Tunnel

Washing machine connected to the container infeed and discharge

Pharmaceutical Container Washing Machine

Bulk container washing removes the specified contamination before the next treatment. Its internal and external access, media sequence and discharge state depend on the container and receiving equipment.

Enclosed processing tunnel with a conveyor and operator display

Sterilization Tunnel

A thermal tunnel treats suitable prepared containers before filling. The selected temperature profile and transfer boundary determine its role; it is distinct from a steam autoclave and from RTU unpacking.

Filling

Vials filling

Liquid Vial Filling

Liquid dosing and stoppering connect formulation behavior with vial handling. Fill verification, product-path design and closure state at discharge distinguish this operation from powder dosing.

Vial Powder Filling

Direct powder filling meters a prepared powder into its container. Powder flow, dosing behavior and containment determine the process; it is distinct from freezing and drying a liquid-filled vial.

RTU

Debagger

Debagging removes the specified outer protective layer of an RTU pack. Pack presentation and transfer protection determine what happens next; removal of a bag is not sterilization.

Tub Opener

Tub opening exposes the specified RTU presentation for the next handling operation. Lid removal, liner handling and transfer of the nest or containers have separate scope boundaries.

Array of filling needles and product tubing over the cartridge transport

Cartridge

Cartridge dosing and closure depend on how the container arrives and which end is already closed. The filled cartridge is a primary container; later assembly into an injector is a separate operation.

Nest of syringes positioned below the processing head

PFS

Prefilled-syringe dosing and stopper placement depend on the barrel, product and RTU or other agreed presentation. Later plunger-rod or safety-device assembly should be distinguished from primary closure.

Enclosed blow-fill-seal machine with a side-mounted process unit

Blow-Fill-Seal (BFS)

BFS combines polymer-container forming, filling and sealing. The formed pack and product establish a different handling route from glass-vial or nested-syringe filling.

Bottle filling line with parallel dosing heads and a guarded conveyor

Oral Liquid Filling

Oral-liquid filling addresses formulation behavior, bottle handling and the selected cap or dosing closure. Its presence in this equipment directory does not imply that every oral-liquid product uses an aseptic route.

Lyo

Freeze-drying chamber with service piping on its rear frame

Lyophilization

Freeze drying removes water from a suitably filled and partially stoppered product through a developed cycle. It is a product-specific branch, not a required step after every vial fill.

Shelf loading equipment aligned with the freeze dryer doors

ALUS

Automatic loading and unloading transfers the defined vial array to and from the freeze dryer. Shelf geometry, vial stability and the protected transfer interface determine the handling scope.

Capping

Capping applies the specified closure component to the container after the relevant filling or stoppering operation. Crimp, screw-cap and other closure duties require distinct tooling and checks.

Isolator

Stainless steel isolator with a row of front glove ports

Filling line isolator

A filling-line isolator encloses the specified aseptic process and its transfers. Product protection, access, interventions and decontamination arrangements must be assessed for the integrated process.

Glove-port cabinet with an operator panel and transfer chamber

Sterility-testing isolator

A separately specified QC enclosure supports sterility-testing sample handling. Its method, transfer controls and product-specific evidence differ from ATMP production handling and the filling-line barrier.

Glove-port cabinet with an operator panel and transfer chamber

ATMP Isolator

An ATMP isolator supports the specified small-batch processing workflow. Material identity, transfers and time-sensitive operations shape the boundary for that process.

Stopping

Stopper processing prepares the selected closure through the required washing, treatment and drying steps. The discharge and transfer method must preserve the condition needed at the filling equipment.

Visual Inspection

Camera stations arranged around a rotary container handling turret

Vial Visual Inspection

Filled-vial visual inspection presents the product and container for checks of defined visible defects. Handling, inspection conditions and reject confirmation depend on the vial and formulation.

Nest of syringes positioned below the processing head

Pre-filled Syringe(PFS) Visual Inspection

Filled-syringe inspection considers the barrel, stopper position and product appearance within the defined defect scope. Its handling differs from that of vials or empty syringe components.

Glass cartridge barrels held beneath a row of metal heads on a rotary turret

Cartridge Visual Inspection

Filled-cartridge inspection addresses the specified container, product and closure defects before the downstream device or packaging process. It does not establish injector functional performance.

Strip of joined unit-dose plastic ampoules with formed twist-off closures

Blow-Fill-Seal (BFS) Visual Inspection

Production BFS visual inspection checks the defined visible defects on the formed and filled container as part of the manufacturing flow. It remains distinct from the separate QC inspection entry and is not a substitute for integrity testing.

CCIT

Container-closure integrity testing assesses leakage by a selected method under defined conditions. Package design, test access and sensitivity requirements determine the method and its place in the process.

Labeling

Rotary labelling equipment with product infeed and discharge

Vial Labelling

Vial labelling applies identification to a suitable closed-container surface. Label presentation, code checks and the transfer to secondary packaging define the station boundary.

Rod handling tools positioned above syringe carriers

Syringe Labelling & Assembly Machine

Syringe labelling and component assembly handle the already filled primary container. The selected add-on components and identification tasks are separate from the filling and primary-closure process.

Pen injector shown with its cap removed

Pen & Autoinjector Labelling

Pen and autoinjector labelling handles the assembled device. Device presentation, label or code checks and the next packaging operation determine the equipment interface.

Strip of joined unit-dose plastic ampoules with formed twist-off closures

BFS Container Labeling

BFS container labelling accommodates the selected polymer-pack geometry. Support, label presentation and identity checks must fit the pack and its secondary-packaging route.

Line integration

Connect only the operations required by the product

The inlet specification establishes product condition, container presentation and closure state. The outlet specification establishes what the next inspection or packaging station receives. RTU unpacking is an alternative to relevant bulk-container preparation, freeze drying is a separate product branch, and barrier systems serve the selected process boundary.

Container grips and nozzles around a washing turret

How it works

How is the route selected from the container presentation?

Start with the actual delivery pack and its documented condition. Trace the operations required to bring that presentation to filling: bulk glass may need washing and thermal treatment, whereas an RTU pack needs the appropriate unpacking and handling sequence. Do not add all directory entries to the same line.

How are equipment interfaces made unambiguous?

Describe the product state, container orientation, closure status and allowed transfer conditions at each handoff. Include how rejects and interrupted transfers are identified so adjacent equipment does not assume a container is ready for the next operation.

Support throughout your project and production

Product and route review

Establish the formulation, container presentation and intended dosing and closure operations. Identify the barrier and component-preparation duties that support the route.

Learn more

Interface and trial scope

Use representative product and packs to assess transfers, fill and closure checks, interventions and reject handling. Define the evidence required for each selected operation.

Learn more

Production preparation

Document format changes, product-path setup and cleaning or decontamination interfaces. Include the recovery procedure when a container or transfer is interrupted.

Learn more

Knowledge hub

2 resources

Frequently asked questions

Does every sterile line need washing, a tunnel and RTU unpacking?

No. They serve different incoming presentations and treatment requirements. Select the preparation route from the actual container supply state rather than treating the directory as a fixed equipment sequence.

Is direct powder filling the same as freeze drying?

No. Direct powder filling doses a prepared powder. Freeze drying starts from a suitably filled product and removes water through a developed freezing and drying cycle. Their equipment and interfaces must remain distinct.

Where does primary closure end and device assembly begin?

A filled vial, syringe or cartridge has a defined primary-closure state. Subsequent rod, safety-device, pen or autoinjector assembly is a separate operation whose inputs must match that state.

Are visual inspection and container-closure integrity testing interchangeable?

No. Visual inspection addresses the specified visible defects; integrity testing assesses leakage with a selected method. Their acceptance questions and test conditions differ.

How does production BFS inspection differ from a QC inspection workflow?

Production inspection works within the agreed manufacturing handling and reject flow. A QC inspection duty follows its own inspection or testing workflow. Define each scope and acceptance question independently; similar container formats do not make the two systems interchangeable.