Define the evidence at the start

A machine can be mechanically complete while its handover package is still incomplete. The inspection plan and document list therefore need to be agreed with the equipment specification.

PREASYS coordinates quality requirements across the manufacturing scope. That means identifying the construction details to check, the tests to witness, the records to retain and the people responsible for review.

Customer-specific standards, destination requirements and applicable equipment legislation are addressed during the project review. Certificates or declarations are requested for their relevant scope; they are not assumed from a supplier’s general description.

Quality review from the agreed requirement to documented handover
  1. 01Requirements review
  2. 02Construction checks
  3. 03Agreed testing
  4. 04Documented handover
Quality review from the agreed requirement to documented handover

Keep the delivered record usable

The handover should identify the final equipment configuration, document revisions and unresolved actions. A later change to a component, control function or operating arrangement should remain traceable to that baseline.

For sterile projects, include the equipment information needed by the site’s contamination-control work. For any project, confirm who will maintain the records after handover and how future service changes will be documented.