Establish the design basis

Engineering starts with the product range, intended process and conditions at the installation site. A new line and a replacement machine create different constraints, even when they perform the same operation.

We review the current layout, available services, required output, material movements and quality expectations. Unresolved points are listed with an owner and a decision date so that they remain visible as the design develops.

Product and process

Dosage form, container or material format, operating range, cleaning needs and process steps to include.

Site and installation

Room dimensions, ceiling height, access routes, utility availability, existing equipment and planned installation windows.

Project boundaries

Equipment supply, interconnecting work, automation, building services, qualification support and third-party responsibilities.

Make each connection explicit

  • Material and container transfer: Transfer position, flow direction, presentation, buffering and the handover condition between operations.

  • Utilities: Connection points, required service quality, consumption information and the party supplying each service.

  • Controls and data: Line states, interlocks, alarms, data exchange and responsibilities for testing the connections.

  • People and access: Operating positions, cleaning access, maintenance clearances and routes for moving equipment or change parts.

  • Quality and documentation: Required records, test responsibilities, approval stages and the evidence needed at handover.

Illustrative layout of enclosed filling equipment and adjacent handling modules
Illustrative line arrangement · project-specific configuration

An interface record in practice

Illustrative planning example: the same record can keep a physical connection, its responsible parties and its open decisions together.

  • Connection: Transfer from the proposed filling equipment to the downstream inspection equipment

  • Information to confirm: Container presentation, transfer height, spacing, line states and the stop condition

  • Responsibilities: Identify who supplies the connecting equipment and who implements each control signal

  • Review evidence: Approved interface drawing, agreed signal list and the relevant test record

  • Open decision: Record the unresolved point, its owner and the date needed for the next design stage

Coordinate the equipment as a system

A change to one machine can affect the line around it. Container orientation may alter the next transfer. A cleaning decision may change drains or service connections. An automation revision may require another supplier to update its controls.

PREASYS coordinates these dependencies across the agreed scope. Drawing reviews, interface decisions and open actions are kept connected to the equipment specification and delivery schedule.

Design development should also distinguish required equipment from future options. Space, utility capacity and control provisions for a later phase can be considered without treating that phase as part of the current supply.

Coordinate material, utility and control interfaces around the equipment boundary
  • 01Material and container transfer
  • 02Equipment boundary
  • 03Utility connections
  • 04Control signals
  • 05Drawings and interface records
Coordinate material, utility and control interfaces around the equipment boundary