Skip to content

Process expertise. Chinese manufacturing. Global perspective.

PREASYS

Equipment & technology

Stopper Processing

Elastomer components are washed, treated and transferred to the closing station in a controlled state.

Stopper processing vessel mounted through the wall of a process enclosure

Stopper Processing

Preasys Stopper Processing System — Sterile Component Preparation from Loading to Filling Line

The Preasys Stopper Processing System is a three-station solution that cleans, siliconises, sterilises, dries, and cools rubber stoppers, caps, plungers, and needle shields — all within a single mobile process vessel that docks directly to the filling line via Rapid Transfer Port (RTP). The components never leave the closed vessel from loading to delivery, eliminating human handling and cross-contamination. A rotating vessel (±110°) creates a fluidised bed process that ensures uniform washing, homogeneous siliconisation, and rapid drying — with batch sizes up to 400 litres.

Product-contact openings and valves on stopper handling equipment

Configuration data

Values below refer to the indicated configurations in the technical comparison on this page.

±110° both directions, fluidised bed process

Vessel rotation

Up to 300 L of stoppers or caps

Max batch volume

35 °C ± 5 °C

Final stopper temperature

Process challenges

1.

Read details

1. Stopper silicone coating is inconsistent

Too little silicone → stoppers stick in the filler bowl, jamming insertion. Too much silicone → excess leaches into the product, causing turbidity or haze.

3. Moisture remains after drying

Incomplete drying leaves water droplets on stoppers, which then enter the sterile filling line and dilute the product. Standard air drying takes hours; aggressive vacuum drying deforms the stopper flange or cracks the silicone layer.

4. Cross-contamination between campaigns

Multi-product lines switch stopper types and formulations. Residual detergent, silicone emulsion, or product trace in the washing tank contaminates the next batch. Manual tank cleaning between campaigns is error-prone and undocumented.

5.Ring of Concern in RTP Stopper Transfer

When sterile stoppers transfer into the isolator through an RTP (Alpha-Beta) port, the annular flange-gasket interface between the treatment tank and the isolator is exposed to Grade C/D room air during docking. This "Ring of Concern" is a narrow dead channel that H2O2 vapor cannot fully penetrate. If not decontaminated, contamination rides this ring directly into the Grade A isolator — invisible to operators, undocumented, and now a known Annex 1 inspection point.

Technical data & features

Stopper material, dimensions, batch size and allowable hold time guide handling and transfer choices.

Product-contact openings and valves on stopper handling equipment
Technical data & features · Parameter comparison
Parameter Specification
System stations 3 — Loading, Processing, Transfer
Process steps Washing → Siliconisation → Sterilisation → Drying → Cooling
Vessel rotation ±110° both directions, fluidised bed process
Max batch volume Up to 300 L of stoppers or caps
Throughput to filling line Up to 24,000 pcs/h (20 mm stoppers); 15,000 pcs/h (32 mm stoppers)
Final stopper temperature 35 °C ± 5 °C
Residual humidity < 0.25 %, no visible moisture
Washing Overflow + bubbling + rotation; vacuum pre-wetting for cavity air removal
Siliconisation Pre-mixed emulsion in separate vessel; homogeneous silicone layer
Sterilisation Saturated steam; pressure and vacuum tests before and after process
Drying Pulsed drying (alternating vacuum and pressure) with vessel rotation
Sterile filter on vessel Not required — aeration through RTP; no filter integrity testing needed
Transfer interface Integrated Beta/RTP in vessel lid; no Y-piece or gasket required
Vessel valves Automated, pneumatic actuated via Harting plug; vessel number auto-recognized by PLC
Lifting device Fully automated ALD — floor or ceiling mounted; 3-axis movement (vertical, rotation, linear)
Transfer chute Automated positioning from vessel to filling-line bunker
Components handled Stoppers, caps, plungers, needle shields, tip caps, lined seals
Automation Recipe control, operator access and batch reporting for the stopper cycle
Mobile vessel Process vessel on trolley; docks to loading, processing, and transfer stations

How it works

How-To

How should we document the stopper preparation and transfer trial?

Map receipt, washing, any specified siliconization, sterilization and transfer to filling. Define the state and identity of the stopper load at each handoff.

Use the proposed load and contact parts to agree rinse, cycle and drying checks. Keep the load ID and recorded conditions with samples taken at the agreed locations.

2. How to validate the siliconizing process consistently?

Stopper siliconization is critical: too little silicone causes stopper sticking and poor insertion; too much silicone leaches into the product and causes turbidity or particle issues. Yet traditional siliconizing is done by hand in open baths, with inconsistent silicone concentration and contact time per batch. Regulators now expect documented, repeatable siliconization parameters.

Preasys stopper treatment systems dose silicone emulsion via a calibrated spray nozzle inside the sealed tank. Concentration, volume, spray time, and mixing speed are recipe-controlled and electronically logged. Each batch has a traceable record of exactly how much silicone was applied.

3. How to prevent cross-contamination between campaigns?

Multi-product lines run different stopper types and materials per campaign. Residual silicone, detergent, or product trace in the washing tank can cross-contaminate the next batch. Manual cleaning of the tank between campaigns is error-prone and time-consuming.

Preasys stopper treatment systems include an integrated CIP cycle: after each batch, the tank automatically rinses with purified water, drains, and dries. The cleaning cycle is part of the standard operating procedure, not an optional manual step.

4. How to transfer sterile stoppers to the filling line without breaking the barrier?

After washing, siliconizing, and sterilizing, the stoppers are sterile. Opening the tank to transfer them to the filling line exposes them to Grade B environment — defeating the purpose of the treatment. The transfer mechanism itself becomes a contamination risk point.

Preasys stopper treatment systems use a RTP with a pipe across ring of concern: the sterile tank docks directly to the filler's stopper bowl. The tank inverts, and stoppers flow into the sterile filling line without ever being exposed to the outside environment. No operator touches the sterile stoppers.

5. How to handle pulsating vacuum drying without damaging delicate stoppers?

Drying stoppers after washing requires removing residual moisture without deforming the stopper or damaging the silicone layer. Simple air drying leaves moisture behind; aggressive vacuum cycles crack or deform the stopper flange. The drying process must be gentle but thorough.

Preasys stopper treatment systems use pulsating vacuum drying: the tank alternates between vacuum release and atmospheric pressure, gently extracting moisture from stopper surfaces without thermal stress. The cycle time and vacuum level are optimized per stopper type (butyl rubber, bromobutyl, Teflon-coated).

6. How to scale from clinical batches to commercial production without changing equipment?

CDMOs run stopper batches ranging from clinical-scale (a few thousand stoppers) to commercial-scale (tens of thousands). Running two separate machines — one small, one large — doubles capital cost and floor space. Yet a single machine must handle both batch sizes without sacrificing validation efficiency.

Preasys stopper treatment systems offer modular configurations: single-station (40,000 stoppers/batch) for clinical and small-scale production, and double-station (up to 160,000 stoppers/batch) for commercial campaigns. The same control platform and recipe structure applies to both — no re-validation philosophy needed when scaling up.

Liquid vial preparation and filling. Follow the preparation, washing, tunnel and vial filling stations. The separate drying equipment serves lyophilized presentations. The line provides process context; the individual product is not identified as a separate station in this view.

Production line · Equipment context

Liquid vial preparation and filling

Explore the process areas on the production line associated with this equipment.

Skip tour
Selected process route 8 equipment areas · Scroll to explore

Follow the preparation, washing, tunnel and vial filling stations. The separate drying equipment serves lyophilized presentations. The line provides process context; the individual product is not identified as a separate station in this view.

Related production lines: Liquid Vial Filling & Packaging Lines · Antibody-Drug Conjugate Manufacturing & Fill-Finish · Vaccine Formulation & Fill-Finish Equipment · Lyophilized Vial Production Lines · Pharmaceutical Cartridge Filling Lines

Line integration

*PFS/Viasl/cartridges filling line

Visual inspection machine

Support throughout your project and production

Define the equipment scope

Stopper material, dimensions, batch size and allowable hold time guide handling and transfer choices.

Learn more

Agree the acceptance test

Agree the discharge container and protected connection to the filling line before finalising the room layout.

Learn more

Prepare for operation

Identify the contact parts and format tooling for Stopper Processing. Agree access for cleaning, the spares to hold and the operating records the site will need.

Learn more

Knowledge hub

2 resources

Frequently asked questions

What is the advantage of a rotating vessel over a static one?

A rotating vessel (±110°) creates a fluidised bed that keeps stoppers moving throughout the cycle. This improves washing uniformity, prevents sticking and clumping during drying, and shortens cycle times — especially in the drying and cooling phases. Static vessels require longer drying cycles and risk stopper agglomeration.

Why is no sterile filter needed on the vessel?

The vessel is aerated through the integrated RTP/Beta port during processing. This eliminates the need for a separate sterile vent filter on the vessel, which saves filter sterilisation steps and integrity testing.

How many stoppers fit in one batch?

A 300 L vessel holds approximately 60,000 pieces of 20 mm stoppers or 30,000 pieces of 32 mm stoppers. For a 24,000 pcs/h filling line running 20 mm stoppers, one batch covers ~2.5 hours of production.

What is the difference between vessel transfer, Beta port container, and transfer bag?

- Process vessel: largest batch, fewest docking procedures, fully automated — best for high-speed lines

- Beta port container: medium batch, manual docking — suitable for smaller lines

- Transfer bag: smallest batch, single-use — flexible but requires frequent RABS docking

Can the system process caps as well as stoppers?

Yes. The same vessel and process handle aluminium caps, flip-off caps, plungers, and needle shields. Cycle parameters are adjusted per component type; cap deformation tests are supported.

How does pulsed drying work?

Pulsed drying alternates between vacuum and overpressure cycles while the vessel rotates. This accelerates moisture removal compared to constant air flow, reduces drying time, and prevents stopper clumping.

What validation support is available?

Agree the cycle development, mapping, drying and sample tests needed for the stopper load. Specify the records and qualification responsibilities for the installed system.

Can the ALD be mounted on the ceiling?

Yes. The lifting device is available in floor-mounted, wall-mounted, or ceiling-mounted configurations. Ceiling mounting saves cleanroom floor space and is ideal for B-corridor installations.

Contact

For a configuration review, include container drawing, product-contact materials, intended dose, closure format, batch size.

Discuss your project
Product-contact openings and valves on stopper handling equipment