Technical insight

Annex 1 Project Planning

Read the official text alongside a structured discussion of equipment boundaries, operations and the information your site team needs.

Two glass vials with closed blue-and-white closures
On this page

The official text

European Commission · Official source

The revised Annex 1 was published on 25 August 2022. It came into operation on 25 August 2023, with point 8.123 following on 25 August 2024.

Source review: 9 November 2026. Read the European Commission text alongside this PREASYS planning note.

Check the scope before selecting equipment

Illustrative layout of enclosed filling equipment and adjacent handling modules
Illustrative line arrangement · project-specific configuration

Annex 1 addresses sterile manufacture. Some principles may also support non-sterile production where contamination control matters; the manufacturer should document which principles it applies.

Its approach connects design, procedures and monitoring within a facility-wide contamination control strategy. Testing alone does not establish sterility assurance. Barrier technology should be considered, with alternatives justified.

Questions for your project team

Concept illustration of nested syringe barrels beneath a filling head
Concept illustration · not an installed system

Use these prompts to begin the equipment discussion; they are not an Annex 1 compliance checklist.

Product exposure

Where is product exposed, and how is it protected?

Transfers

How do containers, components and materials enter the process?

Interventions

Which operator interventions remain, including during stoppages?

Evidence

What design, test and monitoring information does the site need?

Bring the equipment boundary into the review

Equipment boundaries connect material transfers, utilities, controls and supporting records
  • 01Material and container transfer
  • 02Equipment boundary
  • 03Utility connections
  • 04Control signals
  • 05Drawings and interface records
Equipment boundaries connect material transfers, utilities, controls and supporting records

Prepare the process flow, container formats, layout, proposed equipment and supplier interfaces. Identify the outstanding decisions and the people responsible for them.

Agree the vendor document package and testing responsibilities with the site’s qualification plan. Annex 15 requires site review of third-party qualification documents and describes the relationship between equipment qualification and acceptance testing.

Explore the relevant equipment and support

Prepare the equipment-boundary discussion

These are project-preparation prompts. Use them with your site's review of the official guidance; they are not a compliance assessment.

What enters and leaves?

Mark the product, containers, components and other materials that cross each equipment boundary, and identify the information needed about their condition.

Who interacts with the process?

List routine work, format changes and the response to stoppages. Identify which activities need further discussion with operations and quality teams.

Which information is needed?

Bring the process flow, layout, proposed configuration and available records. Assign the remaining design, testing and document questions to their owners.