Skip to content

Process expertise. Chinese manufacturing. Global perspective.

PREASYS

Equipment & technology

Pharmaceutical Depyrogenation & Sterilization Tunnel

Containers travel through heating and cooling zones before entering the filling area.

Enclosed processing tunnel with a conveyor and operator display

Sterilization Tunnel

Overview:

For numerous drug products, pre-cleaning is succeeded by additional drying, sterilization, and depyrogenation—each further reinforcing product safety. The inherent challenge lies in reconciling elevated throughput and reproducibility with the preservation of potentially delicate formulations and containers. Our suite of compact pharmaceutical cleaning systems and depyrogenation tunnels is engineered to empower pharmaceutical and biotech organizations in rising to these challenges.

Conveyor opening at the end of a depyrogenation tunnel

Example project input

This geometry calculation is travel time only. It does not establish glass temperature, lethality or endotoxin reduction; assess loaded temperature profiles separately.

1,800 mm

Length of the example heated zone

150 mm/min

Illustrative belt speed

12 min

Nominal residence in that zone

Your process, your benefits

Belt loading, glass mass and the receiving room conditions affect the required thermal study.

Process challenges

Conveyor opening at the end of a depyrogenation tunnel

Backflow from washing room to Sterilization zone?

Pressure cascade design unreasonable?

Scratch on vials?

Sterilization of cooling zone?

Features

Conveyor opening at the end of a depyrogenation tunnel

Low-turbulence, vertical air flow for optimal heat transfer

Preasys maintenance of production parameters

Gentle container heating

High energy efficiency

Liquid vial preparation and filling. Follow the preparation, washing, tunnel and vial filling stations. The separate drying equipment serves lyophilized presentations.

Production line · Equipment context

Liquid vial preparation and filling

Explore the process areas on the production line associated with this equipment.

Skip tour
Selected process route 8 equipment areas · Scroll to explore

Related equipment and interfaces

Upstream container washing

Washer

Confirm the washing process for the container entering the dry-heat tunnel.

Read more

Before dry-heat treatment, define the washing process for the selected container. Confirm the rinsing and spraying sequence, media quality, drainage and handling parts. Review media separation and the transfer interface with the tunnel for the intended production arrangement.

Filling interface Dosing method Fill monitoring Product recovery Cleaning and sterilization scope

Filler

Read more

Dosing selection — Select the filling method from the product properties, dose range and container. Confirm the pump or pressure-dosing arrangement and format parts for the proposed machine.

In-process control — Specify the weighing coverage, reject handling and feedback functions. If 100% container weighing is required, confirm the achievable rate for the selected fill volume and product.

Product recovery — Define the start-up, batch-end and changeover procedure. Measure residual product and establish whether recovered material may be reused for the intended process.

Headspace oxygen — For oxygen-sensitive products, specify inert-gas flushing before stoppering. If residual oxygen ≤0.5% is required, agree the measurement method and acceptance criterion for the actual container and formulation.

Cleaning and sterilization — Define the product-contact boundary and the required cleaning or sterilization method. Confirm which parts are included in any proposed CIP/SIP cycle and how coverage is demonstrated.

Controls and records — Specify recipes, access roles, audit trails, electronic signatures and batch records where required. Agree the automation tests and site qualification scope for the supplied configuration.

Capper

Vial crimping and line interfaces

Confirm the vial, stopper and cap combination and the required crimping rate.

Read more

Crimping setup — Confirm the vial, stopper and cap combination, the available speed adjustment and the required line rate with the selected capper.

Process settings — Review which crimping parameters are adjustable, displayed and recorded on the HMI. Confirm any head-level force or pressure monitoring in the proposed configuration.

Closure checks — Agree crimp acceptance criteria for the actual vial, stopper and cap. Review visual checks and any separate closure-integrity test needed for the product.

Access and changeover — Review reject-discharge access, guarding, cleaning access and the tools or format parts required for changeover.

Container handling — Confirm the transfer method and operating speed using the intended vials. Check handling and closure condition during the line trial.

Visual inspection

Visual inspection for the selected container

Select the inspection machine for the container format and product.

Read more

Inspection setup — Select the optics, container handling and rotation profile for the product and container. Confirm which surfaces and defect types can be assessed using representative samples.

Format changeover — Confirm the tooling and procedure for the selected container. For a vial inspection configuration using a 15-minute changeover target with two operators, verify this during the format trial.

Reject decisions — Define acceptance rules, reject verification and the handling of uncertain results. If re-inspection is included, agree how units and results are identified and recorded.

Discharge interfaces — Confirm the routing and identification of accepted units, rejected units and samples, including the handoff to downstream equipment.

Installation requirements — Confirm the selected machine’s utilities, extraction requirements, footprint, service clearances and upstream and downstream interfaces.

Separate autoclave option

Batch steam sterilizer option

A batch steam sterilizer is a separate equipment option. Define the load and packaging, then select the appropriate steam or air/steam process, loading arrangement and cycle acceptance criteria.

Autoclave chamber

For the separate batch sterilizer, specify chamber material (316L where selected), circular or square section, capacity within the listed 200–6,800 L range, and a mechanically polished internal finish of Ra < 0.4 µm. Confirm the loading arrangement for the chosen chamber.

Autoclave doors

For a batch steam sterilizer, review the chamber door and seal against the intended load. This is a separate equipment option from the continuous dry-heat tunnel.

Autoclave process control

For the selected batch sterilizer, confirm the listed four PT100 probes per chamber and the pressure-based control specification of temperature variation < 0.5 °C against the intended cycle and load. Agree the alarm list and cycle records for that configuration.

Autoclave configuration review Review controller configuration, factory test records and the installation and operation tests required at site. Confirm chamber and loading dimensions for the selected model. Agree maintenance tasks and record utility use for the selected cycle. Applicable requirements Agree the required standards and jurisdiction-specific documentation for the supplied equipment and installation. Documentation to confirm

Confirm required certificates and material records

How it works

How does glassware pass through the tunnel zones?

Containers travel through heating and cooling zones before entering the filling area.

How is the transfer to filling assessed on the line?

Define the tunnel-to-filler transfer and the sampling positions for the acceptance study.

Support throughout your project and production

Define the equipment scope

Belt loading, glass mass and the receiving room conditions affect the required thermal study.

Learn more

Agree the acceptance test

Define the tunnel-to-filler transfer and the sampling positions for the acceptance study.

Learn more

Prepare for operation

Identify the contact parts and format tooling for Sterilization Tunnel. Agree access for cleaning, the spares to hold and the operating records the site will need.

Learn more

Knowledge hub

2 resources

Frequently asked questions

What determines the configuration for Sterilization Tunnel?

Belt loading, glass mass and the receiving room conditions affect the required thermal study.

What should we send when specifying Sterilization Tunnel?

Container drawing, product-contact materials, intended dose, closure format, batch size.