Connect synthesis and filling interfaces
Read details
Define the transfer from the radiosynthesizer to the selected filling and handling equipment.
Process expertise. Chinese manufacturing. Global perspective.
Application solutions
Explore the existing nuclear medicine equipment portfolio as connected process stages: radiosynthesis, shielded handling, filling and inspection. The isotope, activity and facility requirements define the final project scope.
Explore the existing nuclear medicine equipment portfolio as connected process stages: radiosynthesis, shielded handling, filling and inspection. The isotope, activity and facility requirements define the final project scope.
Set the hot-cell interfaces
Locate synthesis, dispensing and inspection relative to the shielded boundary. The isotope, activity and site conditions inform the project design.
2
Shielding and synthesis references
2
Dispensing and inspection references
2
Site engineering support
—
Process options
Define the transfer from the radiosynthesizer to the selected filling and handling equipment.
Review the hot-cell enclosure, transfer interfaces and operator access as a separate supporting scope.
Review the inspection system and its interface with filled-container handling.
Main process
Define the transfer from the radiosynthesizer to the selected filling and handling equipment.
Parallel support
Review the hot-cell enclosure, transfer interfaces and operator access as a separate supporting scope.
Main process
Connect the radiopharmaceutical filling system to upstream synthesis and downstream inspection.
Equipment scope by process stage. Alternative routes and supporting systems are identified separately.
Main process
Define the transfer from the radiosynthesizer to the selected filling and handling equipment.
Parallel support
Review the hot-cell enclosure, transfer interfaces and operator access as a separate supporting scope.
Main process
Connect the radiopharmaceutical filling system to upstream synthesis and downstream inspection.
Downstream
Review the inspection system and its interface with filled-container handling.
Lifecycle
Define engineering interfaces and validation or training support for the project.
Use these inputs to define the proposed configuration. Confirm operating values against the selected model and trial conditions.
| Project input | What to record and why |
|---|---|
| Product characteristics | Record the product state at each transfer and any sensitivity to temperature, shear, light or exposure. Use these constraints to select the handling route. |
| Primary container | Identify the part that contacts or holds the product, its closure and its condition at infeed. A preassembled or nested presentation changes the preparation steps. |
| Handling requirements | Mark open transfers, hold conditions and identity checks on the process drawing. These boundaries govern transfer equipment and operator access. |
| Process trials | Choose a representative material and container. State the question the trial must answer and how the accepted output will be measured. |
| Site scope | Mark where the supplier's equipment begins and ends; list utilities, controls and material transfers supplied by others. |
Walk the proposed transfer with a representative container. Mark handling tools, barriers and the inspection or shielded destination on the route drawing.
Record the order of filling, inspection, labelling and dispatch together with access restrictions. Site specialists set radiation-protection requirements and allowable timings.
Define the transfer from radiosynthesis to the selected filling and handling equipment.
Agree the engineering interfaces and the validation or training support required for that scope.
Define the transfer from the radiosynthesizer to the selected filling and handling equipment.
Learn moreDefine engineering interfaces and validation or training support for the project.
Learn moreIdentify the contact parts and format tooling for Radiopharmaceutical & Nuclear Medicine Equipment. Agree access for cleaning, the spares to hold and the operating records the site will need.
Learn moreShare product characteristics, primary container and handling requirements.
Request product information
Brochure
Radiopharmaceutical & Nuclear Medicine Equipment
Available by enquiry
Request product information ↗Case
Radiopharmaceutical & Nuclear Medicine Equipment
Available by enquiry
Discuss project references ↗2 resources
Define the physical transfer point, shielding responsibility and means of remote handling. Check reach, container orientation and access together on the layout.
Agree the inspection, labelling and container transfer arrangements for the intended presentation with the project's radiation protection team.
Define the process, equipment interfaces and project requirements for your Nuclear medicine line.
Discuss your projectYOUR PRIVACY
This website currently uses no analytics or marketing trackers. You can return to these settings at any time using the footer.
Essential page navigation, inquiry submission and your saved privacy preference.
No analytics cookies, analytics scripts or third-party measurement are enabled.
No advertising cookies, remarketing pixels or embedded social trackers are enabled.
Saving stores your preference in this browser only. It does not enable optional tracking. See our Privacy Statement for inquiry data information.
CONTACT PREASYS
Share your product, process and project priorities so we can direct your enquiry to the appropriate team.