Select for the equipment scope

Different equipment requires different manufacturing expertise. PREASYS coordinates specialist manufacturing partners around the agreed technical requirements, quality arrangements and delivery responsibilities.

Supplier review considers the work to be performed, the capability needed to perform it and the records required for review. Component selection, inspection points and document responsibilities should be clear before purchasing starts.

The project scope identifies what PREASYS supplies, what manufacturing partners deliver and what remains with the customer or other contractors. This gives each party a common basis for purchasing, production and acceptance.

From purchase to shipment

1. Procurement

Confirm the approved specification, component makes, materials and interfaces. Plan purchasing around critical lead times and keep accepted substitutions visible in the project record.

2. Production

Track manufacture and assembly against agreed milestones. Record open technical actions, review progress with manufacturing partners and prepare the materials, witnessing arrangements and documents needed for acceptance.

3. Delivery

Confirm shipment dimensions, preservation, packing and shipping documents. Align the transport route, receiving site and unloading arrangements with the installation plan before equipment is released.

Keep decisions traceable

  • Critical purchased items: record the approved specification, responsible supplier, expected lead time and the milestone that depends on delivery.

  • Substitutions and changes: record the proposed alternative, the reason for the change and its effect on interfaces, controls, maintenance and documentation. Keep the accepted decision with the project record.

  • Open technical actions: give each item an owner, a target date and the evidence needed to close it before the affected acceptance or shipment milestone.

  • Shipment readiness: review packing, preservation, document status and receiving-site readiness together, so a completed machine is not treated as a completed delivery.

Keep responsibilities visible

Responsibility follows the agreed project scope. Confirm the handover between each party before work begins and update it when the scope changes.

  • PREASYS: coordinate the agreed purchasing and delivery scope, technical interfaces, progress reviews and open actions.

  • Manufacturing partners: carry out their assigned manufacture, assembly, inspection and record preparation against the agreed requirements.

  • Customer and site team: confirm site access, utilities, import and unloading arrangements, storage conditions and installation readiness within their scope.

  • Other contractors: confirm the interfaces, timing and handover evidence for their own equipment, construction or installation work.

Plan for changes and future parts

Identify critical components early. An alternative source may affect fit, control interfaces, documentation or maintenance, so availability alone is not enough to approve a substitution.

For ongoing operation, confirm component identification, recommended spare parts and replenishment arrangements with the equipment scope. Local response, stock availability and support responsibilities are agreed for the project.

Prepare the receiving site

  • Confirm the route: check shipment dimensions, access restrictions, unloading space and lifting arrangements before dispatch.

  • Plan storage: agree the protection, environmental conditions and storage period if installation will not begin on arrival.

  • Align people and documents: identify who receives the shipment, checks the packing list and condition, records discrepancies and coordinates installation.

Discuss your delivery scope

Bring your equipment scope, destination, target schedule and any known site constraints. We can review the purchasing, manufacturing and delivery interfaces that need to be agreed for your project.