Quality and handover
Agree the checks and records early, then keep the delivered evidence connected to the equipment.
A machine can be mechanically complete while its handover package is still incomplete. The inspection plan and document list therefore need to be agreed with the equipment specification.
PREASYS coordinates quality requirements across the manufacturing scope. That means identifying the construction details to check, the tests to witness, the records to retain and the people responsible for review.
Customer-specific standards, destination requirements and applicable equipment legislation are addressed during the project review. Certificates or declarations are requested for their relevant scope; they are not assumed from a supplier’s general description.
Confirm intended use, critical specifications, manufacturing capability and the evidence required from each responsible party.
Review the agreed drawings and construction details. Inspect critical items at the stage when they can be examined and corrected.
Perform the agreed tests, retain the results and list deviations or outstanding actions with an owner.
Confirm the delivered scope, installation information, updated records and support responsibilities. Close or formally manage the outstanding actions.
What will be checked?: Identify the requirement, agreed test conditions and intended acceptance basis, including any limits in the materials or setup available.
What will be retained?: Agree the observations, settings, results and supporting records needed to understand what happened during the test.
How will actions close?: Record outstanding points with an owner and a closure route, and identify when a change requires an updated record or further check.
The following is a planning list. The final package depends on the equipment, intended use and contract.
Equipment specification, approved layouts, interface list
Relevant material records, component identification, agreed fabrication and inspection records
Test plans, completed results, calibration records where required, deviations and action closure
Operating instructions, cleaning information, maintenance schedules, parts lists
Agreed supporting drawings, vendor records and protocol inputs
For each record, identify the equipment reference, revision, reviewer and handover status. This is a planning structure; the final package is agreed for the project.
Illustrative index fields for a project document list. The actual deliverables and acceptance status are agreed for the supplied equipment.
Equipment or package reference: Which supplied item the record covers
Document title and identifier: What the record contains and how it can be located
Revision and issue date: Which version belongs to the delivered configuration
Review status and responsible party: Who needs to review, update or accept the record
Linked open action: What remains to be completed, by whom and at which project stage
Agree the qualification strategy and responsibility for each activity before testing begins. Factory acceptance testing, site checks and qualification each have their own purpose; the project should identify which evidence can be reused and which activities are needed at the installation site.
EU GMP Annex 15 addresses this relationship. It also calls for site review of qualification documentation supplied by third parties. PREASYS supports the agreed equipment and documentation scope; the pharmaceutical manufacturer controls its site qualification and product manufacturing decisions.
Official European Commission guidance, including equipment qualification stages and use of vendor documentation.
Explore this topic ↗The handover should identify the final equipment configuration, document revisions and unresolved actions. A later change to a component, control function or operating arrangement should remain traceable to that baseline.
For sterile projects, include the equipment information needed by the site’s contamination-control work. For any project, confirm who will maintain the records after handover and how future service changes will be documented.
Define vendor support, training and the customer’s site responsibilities.
Explore Qualification Support & Operator Training →Open the primary guidance relevant to your project.
Explore Regulations →Relate sterile-production requirements to equipment and interface decisions.
Explore Annex 1 Project Questions →YOUR PRIVACY
This website currently uses no analytics or marketing trackers. You can return to these settings at any time using the footer.
Essential page navigation, inquiry submission and your saved privacy preference.
No analytics cookies, analytics scripts or third-party measurement are enabled.
No advertising cookies, remarketing pixels or embedded social trackers are enabled.
Saving stores your preference in this browser only. It does not enable optional tracking. See our Privacy Statement for inquiry data information.
CONTACT PREASYS
Share your product, process and project priorities so we can direct your enquiry to the appropriate team.